Following the severe flooding that occurred around the parish in the winter of 2019/2020, the Waveney Local Drainage Board have developed a set of proposals to specifically deal with the situation affecting Shimpling. These consist of a series of ponds, leaky dams and flood meadows and these are shown on the attached plans. It is hoped these proposals will be carried out during 2023.
![](https://burstonandshimpling.org.uk/wp-content/uploads/2022/12/Shimpling-Flood-Management-overview-plan-1024x724.png)
Above areas as downloadable pdf files
Shimpling – Flood Management – Plan 2
Shimpling – Flood Management – Plan 3
Shimpling – Flood Management – Plan 4
Shimpling – Flood Management – Plan 5